 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| n |
More or deeper
soil testing to determine
|
|
the edge of the
landfill
|
|
|
| n |
Install 2
groundwater test wells along
|
|
|
Morse Street to
check for VOCs
|
|
|
| n |
Test pits – off-site disposal of excess waste
|
|
|
and certified
clean soil for site restoration
|
|
|
| n |
Revise Schedule
|
|
|
|
– |
Interim Report
within 3 months of finishing field
|
|
|
work
|
|
|
|
– |
Final report due
by March 31, 2005
|
|